Project overview
We completed SCADA installation and commissioning in the distribution substation buildings of two solar power plants in the KCETAŞ distribution region. Siemens SICAM A8000 CP-8031 RTUs were used on site, and communication with the plants' Schneider Electric Easergy P3 protection relays was established through these RTUs.
01 Scope
- SCADA installation in the distribution substation buildings of two solar PV plants
- Installation of Siemens SICAM A8000 CP-8031 RTUs
- RTU communication with Schneider Electric Easergy P3 protection relays
- Individual checks of all field signals
- Communication and functional testing
- Integration into and commissioning with the KCETAŞ SCADA system
02 Technologies used
- Siemens SICAM A8000 CP-8031
- Schneider Electric Easergy P3
03 Baratoprak's responsibility
- SCADA installation and commissioning
- Communication between RTUs and protection relays
- Signal, communication and functional testing
- Integration into the distribution utility SCADA system
04 Project scale
2 solar PV plants.
05 Result
Both plants were successfully integrated into the KCETAŞ SCADA system and can now be monitored with the correct signals in the utility's SCADA.