Commissioning systems by proving them in the field through point-to-point (PtP), secondary injection, trip, communication and functional testing.

Substations tested end to end · SEDAŞ
439
Substations PtP-tested to date · UEDAŞ
50

On a large SCADA project the challenge is not commissioning a single substation — it is proving at every substation that each signal matches reality in the field. Our testing and commissioning teams verify the complete system end to end at every substation once installation is finished.

We run signal-by-signal point-to-point (PtP) tests between field, RTU and SCADA, verify protection functions with secondary injection and circuit breaker controls with trip tests. We compare SCADA displays against field data and commission substations in phases.

Capabilities

  • End-to-end PtP testing between field, RTU and SCADA
  • Secondary injection testing
  • Trip testing
  • Communication testing
  • Local/Remote control testing
  • Verification of SCADA displays against field data
  • Phased commissioning